The first holds showed the gap. A job would stop, the dashboard would say it needed a human, and the human would open the job and find a status line. Why it stopped was in there somewhere. What to do about it was not.
The rule
From today a hold is not complete without a hand-off note. The note says what stopped the job, what has already been tried, and the specific things the owner can do: approve it as it stands, send it back with a change, run a command the pipeline itself was not allowed to run, or decide something only they can decide. If none of those apply, the note says that too.
Why it matters
The owner is the only person who can clear a hold, and they are usually elsewhere. A hold that costs them ten minutes of reading before they can act is a hold that waits a day. The note is the pipeline doing that reading first.