The Factory was rebuilt at the end of October, and it came with a board of its own, drawn first as an artifact on claude.ai. The owner did not want two boards. The one on the site, built job by job through October, gave way to the new one.
Same place, new board
Factory Floor lives at the same address under the private area, behind the same sign-in. What changed underneath is where the data comes from: the Factory now pushes every job and spec to the site’s job store as it works, so the board shows live work instead of what a clerk remembered to sync. The drawer for a job shows its spec in full.
Job 011
This was Factory job 011 for the site, and the Factory’s own job 001 was the other half: the push from the pipeline to the store. The two merged a day apart. A screenshot was taken for this entry, but the tester captured the wrong window, so there is no picture.